Wednesday, 08 March 2017 16:01
Auto Sun Tracker based Solar Tubewell System for KPK Public Health Department
Written by Web Master
Published in
Projects AST
Latest from Web Master
- 15.93KW Fixed Minting Structure Solar System for DWSS Hafiz Sardar Sham Garyam Kohat Division
- 24.08KW Auto Sun Tracker based Solar Tube Well for Lift Irrigation Scheme at Pushtoon
- .
- 14.2 KW Fixed Mounting Structure Solar System for DWSS Mandana Sararogha South Waziristan Agency
- 14.2 KW Fixed Mounting Structure Solar System for DWSS Mandana Shangi South Waziristan Agency